Contract With a Chinese Supplier: 5 Questions First
The contract is the document villa owners read the least and depend on the most. Everything else in a China order — the quotation, the drawings, the production photos — describes what you are buying. The contract decides what happens when the two sides disagree about it, and for most buyers that is the only moment the document matters. This guide answers the five questions we hear most often before the ink dries: whether you need a Chinese-law lawyer, what the contract must attach, how to stage the payments, which delay penalty actually works, and the five clauses that should never be deleted.
The short version of the answer to all five: you do not need a legal retainer, but you need three legal decisions written down (governing language, dispute venue, enforcement route); the contract is only as good as its annexes (drawings, BOM, finish schedule); the market-standard split is 30/70 with the balance conditioned on inspection, not completion; a delay penalty works only when it is a percentage, per week, and tied to a named date; and five clauses — spec annex, AQL inspection standard, tooling ownership, governing version, CIETAC venue — are what separate a professional villa supplier from a risky one. The figures below reflect current market practice for cross-border custom furniture contracts (sourcing-industry practice reference, updated July 2026), and each one is worth checking in your own document before you sign.
In This Guide
- Q1: Do I Need a Lawyer Who Practices Chinese Law?
- Q2: What Must the Contract Attach — Drawings, BOM and Finish Schedule?
- Q3: How Should Payment Be Staged? (30/70 and Why Balance Only After Inspection)
- Q4: What Delay Penalty Actually Works?
- Q5: The Five Clauses That Should Never Be Deleted
- Red Flags: Where Contracts Go Wrong
- The Five Questions, Answered in One Table
- Frequently Asked Questions
Q1: Do I need a lawyer who practices Chinese law?

For a villa order — typically in the range of USD 50,000 to 500,000 — most buyers do not need a full legal retainer, and a lawyer is not the tool that makes a contract safe. What makes it safe is three specific decisions, written into the text: the governing language, the dispute venue, and the enforcement route. Those three lines cost nothing to negotiate and they are what a court or an arbitration body actually uses.
Start with language. The standard for a cross-border villa contract is bilingual — English and Chinese — and the document must state which version governs. That line matters more than it looks: an English-speaking buyer lives in the English text, but the version a Chinese court would read is the Chinese one. If the two drift apart, the governing-version clause decides which side wins the argument. If the contract has no governing version, you have not made a decision; you have only postponed it.
Then venue. For cross-border furniture disputes with mainland Chinese factories, CIETAC arbitration in a named city is the most commonly enforceable route. “Named city” is the detail people miss: a clause that says “arbitration under CIETAC rules” without naming the seat leaves an opening, while “CIETAC, seated in Shanghai” (or Shenzhen, or Foshan) closes it. A factory that resists writing the venue in is telling you where it expects the dispute to be decided — usually somewhere inconvenient for you. You do not need a lawyer to write these lines. You need a supplier willing to accept them, and the willingness is itself the diagnostic.
Q2: What must the contract attach — drawings, BOM and finish schedule?
A villa contract with no annexes is a promise, not a specification, and the difference is the entire point of the document. The main body of the contract states the price, the dates and the penalties; the annexes state what is being built. When the two disagree — and vague annexes always disagree eventually with a real floor — the annexes are what an inspector, a surveyor or an arbitrator can measure against. A contract that cannot be measured against is a contract that cannot be enforced.

There are three annexes a villa order should never ship without. First, the confirmed production drawings — the set you signed off in the 48-hour design confirmation, with dimensions, elevations and section details for every room. Second, the bill of materials with quantities per room — the document we break down line by line in our guide to reading a BOM before paying a supplier. Third, the finish schedule: the veneer species and batch rule, the laminate or lacquer specification, the hardware family, and the colours, each pinned to the room or the cabinet run it applies to.
The clause to check is a simple one: the annexes are part of the contract. “As per drawings” must mean “as per the attached drawings, version dated X”, not “as the factory interprets the mood board”. This is also where the first red flag shows itself — a supplier who is happy with the price but resistant to attaching a detailed specification is not protecting you from bureaucracy. It is protecting its own flexibility, at your expense. Every precise number in the annex becomes an inspection criterion later, which is why the pre-shipment inspection runs against the BOM and the finish schedule rather than against taste.
Q3: How should payment be staged? (30/70 and why balance only after inspection)
The market-standard split for custom casegoods under one container is 30/70: a 30% deposit at order release, and a 70% balance that is conditioned on pre-shipment inspection, not on production completion. The deposit figure is customary and rarely negotiable below 30%; if a first order asks for more than 50% up front, or any order asks for full prepayment, that is a red flag independent of the product.
For a full-villa package — multiple rooms, several factories or several production lines — the standard moves to three stages, typically 30/40/30, with each stage tied to a documented milestone rather than a calendar date: deposit at order release; the middle payment when materials are in and the carcase frames are standing, verified by photos; the final stage when the finished goods are complete and inspected, with the cargo released. The shape of that milestone chain on a 60-day build looks like Day 0 deposit, Day 20 materials and frames, Day 45 pre-shipment QC, Day 60 balance and release. The rule underneath the numbers: progress is paid against evidence, and the evidence is dated photographs, the inspection report, or a signed QC sheet — never “production is finished” as the factory describes it.
Two refinements matter at the villa scale. For a first-time relationship above roughly USD 80,000, a letter of credit is the standard upgrade: bank-guaranteed and staged against the same milestones, it adds two to three weeks to the timeline and 0.5–1.5% in bank fees, and its value is that it converts trust into a paper trail a Chinese court or arbitration body will recognise. And for solid-wood programmes going to humid climates, a retention is common practice: 90% at shipment and 10% held for 30–60 days after delivery and installation, because solid wood moves in a new climate and the retention is what keeps the remedy alive. The golden rule that holds across every structure: for custom orders, the balance payment should never be due before the buyer or the buyer’s agent has physically inspected the finished goods — in person or through a trusted agent, and exactly the way our inspection-before-seals guide is built to run.
Q4: What delay penalty actually works?
Custom villa production runs 45 to 90 days depending on the scope, and the delay clause is where most first-time contracts go soft. The form that works in this trade is a percentage, per week, beyond a named grace period: 0.5% of order value per week of delay beyond the agreed grace period, with the delivery date written into the contract as a specific calendar date. Each element earns its place. The percentage scales the penalty to the order — a flat sum is either meaningless on a large villa or brutal on a small one. The weekly unit keeps the pressure honest: a monthly penalty lets a supplier absorb a whole month of slippage for free. And the named date is what makes the clause enforceable at all, because “on time” and “prompt delivery” are not dates.
The grace period is the line to negotiate knowingly, not blindly. One to two weeks of grace is the working norm, because a villa build has real variability — veneer batch arrival, lacquer cure time, the inspection window itself — and a penalty that fires on day one of a 60-day build will be paper. What the penalty is actually for is the tail: the supplier that slips four weeks and, without a penalty, has no economic reason to prioritise your order over the one that does pay. And the tail is exactly where your schedule breaks — a villa container that lands four weeks late against a FCL booking means a changed vessel, a changed customs window and a builder waiting on site.
One practical test before you sign: put a pencil in the clause and write the date. If the contract does not let you fill in a specific day for completion and shipment — “delivery by 15 January 2027” rather than “within the agreed period” — the penalty clause has nothing to bite on, however large the percentage. A supplier that resists a dated delivery commitment is telling you, in advance, how it will treat the schedule.
Q5: The five clauses that should never be deleted
When a supplier’s “standard contract” comes back from negotiation, the test is not how much it gave you — it is what it lost. Five clauses belong in every villa contract, and if any of them has been deleted, the document has quietly stopped protecting you.
1. The specification-annex clause. The drawings, BOM and finish schedule are annexes to the contract, and any change to them must be a written change order signed by both sides. Without it, a verbal “we adjusted the drawer layout slightly” becomes your problem at inspection time.
2. The inspection standard. For luxury furniture the working standard is AQL 2.5 — a defined sampling plan with defined accept/reject thresholds. “Quality must be acceptable” is not a standard; it is an argument. The clause should also name who inspects, when (pre-shipment, goods complete, crates open) and what the buyer’s agent or inspector can do: photograph, measure against the BOM, and hold release.
3. Tooling and mould ownership. If the factory makes a custom profile, mould or tool for your design — a shaped fluted panel, a bespoke door line, a named hardware profile — the contract should state who owns it and what you can do with it afterwards, including using it with another factory. This is the clause that a factory is most motivated to omit, because it is the one that keeps your design inside its walls.
4. The governing language version. Bilingual text, one named governing version, stated once and clearly. It looks like a clerical line and it is the line that decides which document you actually signed.
5. The CIETAC venue. Arbitration under CIETAC rules, seated in a named city, in the language the contract governs in. It is the route that cross-border furniture disputes are actually decided by, and it is what makes the other four clauses worth having.
None of these five is expensive to negotiate — none costs money, only willingness. A supplier that accepts them all in one pass is telling you it has had this conversation before, with other overseas buyers, and won. That is the cheapest due diligence available, and it costs less than the first meeting with a lawyer.
Red flags: where contracts go wrong
Most contract problems are visible before the money moves, and they cluster in a short list. The five we check on every villa order, in the order buyers encounter them:

| Red flag | What it means | What to do |
|---|---|---|
| Deposit above 50% on a first order | The supplier is financing its risk with your cash | Walk, or restructure to 30/40/30 with evidence milestones |
| Full prepayment requested | No one with a real schedule asks for 100% up front | Decline; a 30% deposit is the market standard |
| Payment to a personal bank account | The receiving party is not the contracted party | Pay only the registered company account; verify it against the business licence |
| Resistance to a detailed spec annex | The factory wants interpretive freedom | Make the annexes a condition of signing |
| One blanket agreement for several suppliers | Each factory’s scope blurs into the others | A separate contract per supplier, each with its own BOM |
The bank-account line deserves its own emphasis, because it is the one that converts a bad contract into a lost payment: a villa deposit wired to a personal account — however reasonable the explanation — leaves the contracted company out of the money trail, and a personal account cannot be verified against the business licence the way a company account can. Check the name on the account, the name on the licence and the name on the contract, and make all three agree before the first wire. Together with the pricing guide and the shipping guide, that single check is the difference between a deposit you can trace and a deposit you can only chase.
The five questions, answered in one table
| Question | The working answer |
|---|---|
| Do I need a Chinese-law lawyer? | No retainer — but three decisions must be written: governing language, CIETAC venue (named city), enforcement route |
| What must the contract attach? | Confirmed production drawings, room-by-room BOM, finish schedule — all as contract annexes, version-dated |
| How should payment be staged? | 30/70 for casegoods, 30/40/30 for villa packages, balance conditioned on pre-shipment inspection; LC above ~USD 80k first order |
| What delay penalty works? | 0.5% of order value per week beyond a 1–2 week grace period, tied to a named delivery date |
| Which clauses never leave? | Spec-annex clause, AQL 2.5 inspection standard, tooling ownership, governing version, CIETAC venue |
The pattern across all five answers is the same one that runs through the rest of this site: every protection is a document, and every document has a checkpoint. The drawings are checked in the 48-hour design confirmation, the BOM is checked before the deposit, the finished goods are checked before the container seals, and the contract — the least romantic document in the order — is what gives every one of those checkpoints its teeth. Read it the way you would read the BOM, line by line, and sign it the way you would sign a drawing: with the version dated.
Frequently asked questions
What is the standard deposit for a Chinese furniture factory?
Thirty percent is the market-standard deposit for custom furniture, and it is rarely negotiable below that. A first order asking for more than 50% up front — or any order asking for full prepayment — is a red flag on its own, regardless of how good the product looks. If the amount is large, the answer is not a bigger deposit but a different structure: staged milestones, or a letter of credit.
Is a 30/70 split safe for a villa order?
Yes, provided the 70% is conditioned on pre-shipment inspection rather than production completion. The two phrases sound alike and they are completely different: “production is finished” is a description, “goods inspected and accepted” is a gate. The balance should only become due when you or your agent has physically checked the finished goods against the BOM and the finish schedule, before the container is sealed.
Do I need a letter of credit?
For most villa orders, 30/40/30 staged payments tied to documented milestones are sufficient. The letter of credit becomes the standard upgrade for a first-time relationship above roughly USD 80,000: it costs 0.5–1.5% in bank fees and adds two to three weeks, but it puts a bank’s guarantee behind the same milestones and creates a paper trail an arbitration body will recognise.
Which language version of the contract counts?
Whichever version the contract names as governing — and it must name one. Cross-border villa contracts are standardly bilingual, English and Chinese, but if the two texts drift apart the governing-version clause decides which side wins. A contract with no named governing version has not settled the question; it has only postponed it until the moment it becomes expensive.
What happens if the factory is late?
The clause that works in this trade is 0.5% of order value per week of delay beyond an agreed grace period, tied to a specific named delivery date. The percentage scales to the order, the weekly unit keeps short slippage honest, and the named date is what makes the clause enforceable. If the contract will not accept a dated delivery commitment, the penalty is decoration.
Can I change the design after the contract is signed?
Yes, but only through a written change order that updates the annexes — the drawings, the BOM and the finish schedule — and is signed by both sides. Once production has started, the annexes are the only reference an inspector or an arbitrator will measure against, so a verbal change is a change to the record you will one day need. The 48-hour design confirmation exists precisely to finish those changes before the first panel is cut.
Send us the draft you have — we will check the payment structure, the annexes and the five never-delete clauses, and mark up what to negotiate before you sign.