Outdoor & Pool Deck Tiles — Anti-Slip R9–R11
The pool deck, the terrace, the outdoor-adjacent walk — the zones where the floor meets water, sun and bare feet. We specify these from the same lines as the interior: porcelain and sintered deck items with anti-slip grades from R9 to R11, and SPC deck planks for the covered zones. The US villa pool area was built on anti-slip sintered deck, calculated from the plan with a 6% waste allowance and palletised by room.
Deck Tiles Graded for Water and Sun
Every wet-area item leaves the factory with its grade marked on the pallet label, so the bathroom tile, the deck tile and the terrace tile never get confused at unloading. Quantities come from your plan the same way as the interior rooms — per-zone areas, the waste allowance, box counts and weights.

Technical Specifications
The standard specification behind every flooring program we produce. Every value can be changed per project — send your floor plan and we confirm the final spec before production.
Full specification
- Anti-slip
- R9–R11 grades for wet areas, marked on the pallet label
- Materials
- Porcelain deck, sintered deck and SPC deck plank
- Formats
- Deck formats across the tile lines; planks for covered zones
- Look families
- Stone, grey and wood-look, matched to the interior floor
- Waste allowance
- 5–8% added to the per-zone schedule
- Packing
- Palletised on wooden bases, shrink-wrapped, labelled by room
- Lead time
- Standard formats usually 7–15 days
- Shipping
- Sea shipping adds 4–8 weeks by destination
Materials We Use on the Deck Line
The deck material earns two things at once: grip under water and colour that does not fade in the sun. Sintered deck items give the pool edge its stone face — the same material as the interior line, so the house does not end at the door. Porcelain covers the terrace in the grades the zone needs.
The SPC deck plank takes the covered zones — the veranda, the shaded side of the pool — wood-look underfoot without the maintenance. Every deck item carries its anti-slip grade on the pallet label, and the look is batch-matched to the interior floor it meets at the threshold.
Decks from Recent Villa Projects
Three outdoor zones from the line — the pool edge, the terrace and the covered veranda:



How a Deck Program Is Built
The eight parts we specify on the drawing, in the order they leave the workshop:
Grade marking
R9–R11 anti-slip grade set per zone and written on the pallet label.
Material choice
Sintered deck for the pool edge, porcelain for the terrace, SPC for covered zones.
Pool edge
The wettest zone takes the highest grade on the schedule.
Cut to drawing
Deck pieces cut to your drawings where it saves on-site waste.
Colour batch
Batch-matched to the interior floor it meets at the threshold.
UV exposure
The look family is chosen for zones that take full sun.
Per-zone quantities
Areas from your plan plus the 5–8% waste allowance, in box counts.
Pallet packing
Shrink-wrapped on a wooden base, room number on the side, photographed before loading.

Porcelain Deck, Sintered Deck or SPC Deck — Which One Where
The three deck materials, side by side, the way we mark them on a villa drawing:
| Porcelain Deck | Sintered Deck | SPC Deck Plank | |
|---|---|---|---|
| Anti-slip grade | R9–R11 as specified | R9–R11 as specified | Textured surface for covered zones |
| Exposure | Terrace, walk, full-sun zones | Pool edge and wettest zones | Covered veranda, shaded pool side |
| Look families | Stone and grey families | Stone, matched to the interior slab line | Wood-look, matched to the interior plank |
| Pairing | Interior porcelain in the same batch family | Interior large-format in the same stone | Interior SPC in the same tone |
How Ordering Works
The same four-step process we use for every villa flooring package — from the first drawing to your loading port:
Step 1: Send the floor plan
Your villa drawings, the pool and terrace marked, by email or WhatsApp.
Step 2: Confirm the deck schedule
Grade per zone, material per exposure, cut-to-size where it saves, waste allowance applied.
Step 3: Approve the sample box
Deck samples in your grades and looks, with the interior-matching piece.
Step 4: Production and packing
We produce, mark the grades, check zone by zone and ship with the schedule.
Ordering & Delivery Specs
Factory-direct from Foshan, China — the same published numbers on every product page, for easy comparison.
| Order / MOQ | No rigid minimum — orders start from a single room; whole-house consolidation available |
|---|---|
| Factory price | Factory-direct pricing, up to ~30% below retail; interior design fee $5–12/㎡ by area (tiers on the pricing page) |
| Production lead time | 45–50 days standard, varies with project scale and material selection |
| Shipping | FOB / CIF / DDP door-to-door · FCL container consolidation · room-by-room labeling & export packing |
| Origin | Foshan, Guangdong, China — 20 years of export experience |
| Certifications | ISO 9001 · ISO 14001 · CE · SGS · SASO · Intertek |
| Warranty | 2–5 years depending on category |
| Pre-shipment QC | Quality inspection report + container loading photos with every shipment |
Frequently Asked Questions
What does the anti-slip grade mean on my pallet label?
R9–R11 is the slip-resistance range we grade wet-area items into, and the grade is written on the pallet label so the right tile goes to the right floor — the pool edge, the terrace and the bathroom each carry the grade their zone needs.
Can the deck match the interior floor?
Yes — the sintered deck is the same material as the interior large-format line, and the look is batch-matched at the threshold. The US pool deck and the Dubai living room were scheduled this way.
Which material do you put at the pool edge?
The wettest zone takes the sintered deck item in the highest grade on the schedule — stain-proof, scratch-resistant, and the same stone as the interior where the drawings call for it.
Is SPC deck really for outdoor-adjacent use?
The line is specified for outdoor-adjacent decks — covered verandas and shaded zones where the wood-look underfoot is wanted. For full-sun, wet-exposed surfaces we specify the rated tile deck items.
How do you calculate deck quantities?
From your plan the same way as interior rooms: per-zone areas, the 5–8% waste allowance, box counts and pallet weights for the freight quotation.
How is deck tile packed for sea shipping?
Palletised on wooden bases, shrink-wrapped, labelled by room with the anti-slip grade on the label. We photograph the packing before the container closes.
Send Your Floor Plan for the Deck Line
Mark the pool, the terrace and the covered zones on the plan — we return the deck schedule with grades, quantities and quotation within 24 hours.
Send Your Floor PlanView How It WorksFlooring & Tiles Overview
Maintained by the George Villa design team — ISO 9001-certified villa interior factory, Foshan, China. Updated September 2026. See how it was delivered — 347 delivered villa projects — or how your order ships door to door.






